INSP-Final Inspection | 2/1/2002 | 2/1/2002 | 2/1/2002 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/1/2002 9:14:57 AM
|
INSP-Final Inspection | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/16/2002 at 08:47:21. Contact: ###-####.
|
INSP-Final Inspection | 1/17/2002 | 1/17/2002 | 1/17/2002 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 1/17/2002 10:54:16 AM need inspectors test for dry system braced; need certification paperwork
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2001 | 7/18/2001 | 7/18/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 13:28:41. Contact: ###-####. hydro okay for overhead 7/18/2001 2:34:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/13/2001 | 6/19/2001 | 6/19/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 14:17:43. Contact: ###-####. obstrcutions; earthquaking; under stairs heads; c/n issued 6/19/2001 3:35:53 PM
|
INSP-Supply line flush | 5/14/2001 | 5/16/2001 | 5/16/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 15:18:07. Contact: ###-####. flush, hydro and cover completed 5/16/2001 1:38:29 PM
|
INSP-Supply line flush | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 15:21:35. Contact: ###-####. permit not approved; 8 inch per civil drawing resubmittal; leaks at 45 degree elbow 3/19/2001 11:11:24 AM
|