INSP-Final Inspection | 5/7/2010 | 5/12/2010 | 5/12/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Conference | 5/7/2010 | 5/11/2010 | 5/12/2010 | A | DONE |
Troy Cobbley
|
|
|
|
INSP-Conference | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Bill and Gary and have set up an inspection for next week.
|
FIR-Aging Inspection | 5/5/2010 | 5/5/2010 | 5/7/2010 | | NR |
Troy Cobbley
|
|
|
I spoke to Keith Craigen again about getting this permit finaled.
|
FIR-Aging Inspection | 3/1/2010 | 3/1/2010 | 3/3/2010 | | DONE |
Troy Cobbley
|
|
|
Information forwarded to Scott Arellano for further action due to non responce of contractor.
|
INSP-Conference | 3/9/2009 | 3/9/2009 | 3/9/2009 | P | DONE |
Troy Cobbley
|
|
|
I spoke to keith about the need to get this permit inspected and finaled. He stated that he would follow up.
|
INSP-Conference | 6/23/2006 | 6/27/2006 | 6/27/2006 | P | DONE |
Troy Cobbley
|
|
|
keith said that he would follow up.
|
FIR-Aging Inspection | 6/23/2006 | 6/23/2006 | 6/23/2006 | | DONE |
Troy Cobbley
|
|
|
Left voice mail with Keith Craigen about getting this permit finaled. Follow up inspection has been set up.
|