INSP-Final Inspection | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | FAIL |
Joe Tawney
|
|
|
###-####.Fail Not ready 12/29/2000 2:18:48 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Joe Tawney
|
|
|
###-####. OK on above ground hydro tests on wet and dry systems 12/7/2000 4:51:15 PM
|
INSP-Sprinkler Rough-in | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | FAIL |
Joe Tawney
|
|
|
ABOVE GROUND Fail on wet system rough in C/N issued 11/30/2000 8:01:46 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | PART |
Joe Tawney
|
|
|
UNDERGROUND FLUSH\\###-#### OK on supply line flush 11/30/2000 8:01:08 AM
|
INSP-Sprinkler Rough-in | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Joe Tawney
|
|
|
r/i-- ###-####-- becky OK on rough in for Dormers 11/16/2000 7:57:10 AM
|
INSP-Sprinkler Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
Joe Tawney
|
|
|
OK to cover supply line 9/5/2000 1:03:45 PM
|