INSP-Final Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/8/2002 10:35:50 AM finaled by 406
|
INSP-Final Inspection | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/26/2001 3:47:36 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | PART |
Joe Tawney
|
|
|
Vinnie ###-#### OK Spklr rough in. Need hydro tests 11/14/2000 12:27:02 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/14/2000 | 11/14/2000 | 11/14/2000 | A | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 11/14/2000 OK on spklr rough in need Above and underground hydro tests
|
INSP-Supply line flush | 11/10/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 11:23:02. Contact: . supply line flush okay 11/13/2000 4:13:32 PM
|