Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR00-00568
StatusFinaled
Name TREASURE VALLEY FIRE
Site Address 622 -24 W IDAHO ST
Project NameSPR ADELMAN BLD-SHELL2
Customer Number 
ePlanReview 
Description
ADELMANN BUILDING UPGRADE-PHASE 2: WORK TO INCLUDE, THE REMAINING UNSPRINKLERED AREAS OF A 2,288 FT/2 PORTION 1ST FLOOR "QUIZNOS" RESTAURANT, (BLD00-02390). THIS IS THE CREATION OF TWO AREAS USED FOR DINING. ONE WILL BE 643 FT/2 AND THE OTHER 400 FT/2. BOTH WITH AREA PARTITIONS AND NEW KITCHENS. THE REMAINING 1ST FLOOR EXISTING TENANT "HAVANA HOUSE" IS ALSO COVERED UNDER THIS PERMIT. "STARBUCKS", A 1ST FLOOR TENANT WAS INSTALLED UNDER FIR99-00393 AND BLD99-01495. TO INSTALL FIRE SPRINKLERS INTO THE ENTIRE 6.205 FT/2 2ND FLOOR NEW TENANT "MANHATTAN GRILL" RESTAURANT. THIS AREA INCLUDES RELOCATION OF AN EXISTING WALL, REMODEL OF AN EXISTING KITCHEN. NOTE: ALL NEW OCCUPANCIES WILL NOT BE APPROVED UNTIL THE FIRE SPRINKLERS ARE INSTALLED, FUNCTIONAL AND APPROVED. THIS INCLUDES THE SHELL AND CORE UPGRADE IN THE BASEMENT (PHASE 1, REMODEL UNDER FIR00-00458, BLD00-01631). THE BASEMENT AND "STARBUCKS," ARE TO REMAIN FULLY OPERATIONAL DURING CONSTRUCTION. FIRE SPRINKLER ADDITIONS SHALL BE PER APPROVED PLANS, MEETING THE INSTALLATION REQUIREMENTS OF NFPA 13 & 72.(BLD00-01631).
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro4/9/20014/9/20014/9/2001PPASS
DetailsRick Jackson
Rick pager ###-#### hydro on overhead okay 4/9/2001 4:01:11 PM
INSP-Supply line flush4/9/20014/9/20014/9/2001PPASS
DetailsRick Jackson
Rick pager ###-####
INSP-Final Inspection4/6/20014/6/20014/6/2001PNR
DetailsRick Jackson
rick pager ###-####
INSP-Sprinkler Rough-in/Hydro4/6/20014/6/20014/6/2001PPART
DetailsRick Jackson
r/i-- rick-- pager ###-#### hydro okay on underground 4/6/2001 2:43:13 PM
INSP-Sprinkler Rough-in4/5/20014/5/20014/5/2001PNR
DetailsRick Jackson
Rich ###-#### underground not ready, will reinspect on 4/6/01 4/5/2001 6:23:29 PM
INSP-Sprinkler Rough-in3/12/20013/13/20013/13/2001APART
DetailsRick Jackson
###-#### okay on second floor; need to insulate concealed space north of kitchen; replace head with bent deflector by type 1 hood 3/13/2001 11:52:09 AM
INSP-Sprinkler Rough-in1/4/20011/3/20011/3/2001PPART
DetailsRick Jackson
Scheduled by Inspector: 409 On 1/4/2001 8:00:54 AM