INSP-Final Inspection | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | PASS |
Joe Tawney
|
|
|
3/26/2001 1:09:28 PM Final OK on spklr system. Add smoke detector outside small bedroom upstairs 3/26/2001 1:10:13 PM
|
INSP-Supply line flush | 3/5/2001 | 3/5/2001 | 3/5/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 07:20:11. Contact: ###-####. supply line flush okay 3/5/2001 10:59:30 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/27/2000 | 11/27/2000 | 11/27/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 09:22:59. Contact: ###-####.//// tenting applied okay to cover 11/27/2000 3:26:51 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 14:52:15. Contact: ###-####. ///// 40 psi air test okay; not approved for cover - need tenting 11/17/2000 9:59:19 AM
|