INSP-Sprinkler Rough-in/Hydro | 4/16/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 16:24:23. Contact: ###-####. OK on underground hydro test 4/17/2001 3:06:39 PM
|
INSP-Supply line flush | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Joe Tawney
|
|
|
###-#### OK on supply line flush 3/8/2001 8:18:57 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 12:04:12. Contact: ###-####. okay to cover; still requires tie in to street 11/13/2000 10:00:49 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2000 | 11/10/2000 | 11/9/2000 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 11:56:38. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/09/2000 at 12:02:59.
|