INSP-Final Inspection | 11/13/2001 | 11/10/2001 | 11/10/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/13/2001 7:36:10 AM complete 24D basement
|
INSP-Sprinkler Rough-in | 6/11/2001 | 6/13/2001 | 6/13/2001 | P | PART |
Rick Jackson
|
|
|
Roy ###-#### 9am hydro okay; obstructions in basement at duct 6/14/2001 10:09:02 AM
|
INSP-Sprinkler Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 3/5/2001 2:27:11 PM Roy at ###-#### earthquaking; heads on system one overspaced; obstructions 3/6/2001 3:13:01 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2001 | 3/5/2001 | 3/5/2001 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 09:25:43. Contact: ###-####. will do the inspection on 3/6/01 3/5/2001 2:27:51 PM
|