DOC - Permit Finaled | | | 2/19/2003 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 5/7/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Joe Tawney
|
|
|
###-#### OK on underground hydro test 5/8/2001 2:32:27 PM
|
INSP-Supply line flush | 5/3/2001 | 5/4/2001 | 5/4/2001 | A | PART |
Joe Tawney
|
|
|
underground flush and witness Becky ###-#### OK on supply line flush 5/4/2001 10:26:29 AM
|
INSP-Supply line flush | 4/27/2001 | 5/1/2001 | 5/1/2001 | A | NR |
Joe Tawney
|
|
|
###-#### Not ready to be rescheduled 5/1/2001 12:13:13 PM
|
INSP-Sprinkler Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/17/2001 5:05:09 PM OK to cover supply line
|