DOC - Permit Finaled | | | 8/1/2001 | | DONE |
Rick Jackson
|
|
|
|
INSP-Final Inspection | 6/20/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Joe Tawney
|
|
|
OK spklrsw in shell 6/21/2001 3:40:28 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/7/2001 | 5/8/2001 | 5/8/2001 | P | PART |
Joe Tawney
|
|
|
above ground ###-#### OK above ground hydro test and Spklr rough in 5/8/2001 2:32:01 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/13/2001 | 4/16/2001 | 4/16/2001 | P | PART |
Joe Tawney
|
|
|
###-####. 4/16/2001 1:36:34 PM OK to cover supply line 4/17/2001 8:33:04 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | PART |
Joe Tawney
|
|
|
###-####. OK to cover supply line from riser up to 90 deg elbow 2/20/2001 12:18:26 PM
|