INSP-Sprinkler Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 | A | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/10/2001 12:45:47 PM OK to cover supply line and under slab mains for bidg # 7 869 Maple Grove
|
INSP-Supply line flush | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PART |
Joe Tawney
|
|
|
ok TO COVER under slab mains on Bldg # 8 3/27/2001 8:23:36 AM
|
INSP-Supply line flush | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PART |
Joe Tawney
|
|
|
ok TO COVER under slab mains on Bldg # 8 3/27/2001 8:23:36 AM
|
INSP-Supply line flush | 3/23/2001 | 3/23/2001 | 3/23/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover supply line to Bldg #8 3/26/2001 8:24:45 AM
|
INSP-Supply line flush | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | PART |
Joe Tawney
|
|
|
OK to cover supply line to bldg #1 3/20/2001 7:54:44 AM
|
INSP-Supply line flush | 3/14/2001 | 3/15/2001 | 3/15/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover supply line & mains under slabs for Bldg #2 3/16/2001 8:21:46 AM
|
INSP-Supply line flush | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | PART |
Joe Tawney
|
|
|
OK to cover under slab mains on Bldg #1 3/15/2001 8:15:26 AM
|
INSP-Supply line flush | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover supply lines for bldgs #4 & 5 3/8/2001 5:23:11 PM
|
INSP-Supply line flush | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | PART |
Joe Tawney
|
|
|
OK to cover two lines at bldg #5 for overhead spklrs 3/7/2001 1:03:29 PM
|
INSP-Supply line flush | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | FAIL |
Joe Tawney
|
|
|
###-####. 3/5/2001 5:13:11 PM Fail Depth of bury 3/7/2001 8:19:10 AM
|
INSP-Supply line flush | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | CANC |
Joe Tawney
|
|
|
###-####. Cancel Work not completed 2/20/2001 2:20:31 PM
|