INSP-Sprinkler Rough-in/Hydro | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 9/7/2001 2:44:21 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/03/2001 at 08:59:48. Contact: ###-####. couldn't do r/i for overhead. permit not issued for the overhead per Bill Alexander 7/3/2001 3:05:10 PM
|
INSP-Sprinkler Rough-in | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PART |
Rick Jackson
|
|
|
###-#### underground flush okay 6/8/2001 2:38:31 PM
|
INSP-Sprinkler Rough-in | 3/8/2001 | 3/8/2001 | 3/8/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/8/2001 10:58:14 AM underground only okay to cover; hydrant too close to building at southeast corner per Pat the hydrant is to be relocated; FDC will be moved to front of building
|