Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR01-00139
StatusFinaled
Name SIMPLEX
Site Address 3852 N EAGLE RD
Project NameALM - BOISE FIRST CHURCH OF TH
Customer Number 
ePlanReview 
Description
Boise First Church of the Nazarene - To install a fire alarm system in a new building. The A2.1occupancy requires a building manual fire alarm system, and a voice alarm system is required for the main assembly area (FLC) due to an occupancy load of over 1000. The sprinkler system requires the alarm system to have off-site monitoring. The system is designed with area smoke detection within all rooms except the Family Life Center. The building TI permit is to complete the interior of a 65,906 sq.ft. church building including a new exterior stair on the east side per approved plans on file. Shell of structure built under permit BLD00-02246. This building's main assembly area is an A2.1 occupancy as well as the youth center on the second floor. Occupant loads are indicated on the approved plans.
NOTE: The main assembly room has a horizontal exit to the interior.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/21/20038/21/20038/21/2003APASS
DetailsTroy Cobbley
Passed by inspector 406
INSP-Final Inspection9/26/20019/28/20019/28/2001APASS
DetailsJoe Tawney
OK for cert. of comp. on fire alarm 9/28/2001 4:56:29 PM
INSP-Final Inspection9/20/20019/25/20019/25/2001AFAIL
DetailsJoe Tawney
Final Fail A number of corrections to be made 9/25/2001 11:33:05 AM