INSP-Final Inspection | 7/6/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 7/6/2001 8:14:29 AM Final OK on spklr system
|
INSP-Sprinkler Rough-in/Hydro | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 16:27:58. Contact: ###-####. need approved plans; head gaurds under stairs; complete EQ; need sidewalls in mezz; hydro okay on ovehead and underground 6/22/2001 10:36:55 AM
|