INSP-Final Inspection | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/18/2002 1:07:04 PM Underground fire line finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/18/2002 1:06:10 PM underground hydro OK
|
INSP-Sprinkler Rough-in/Hydro | 2/26/2002 | 2/28/2002 | 2/28/2002 | A | CANC |
Troy Cobbley
|
|
|
cancelled by contractor 2/28/2002 1:13:31 PM
|
INSP-Supply line flush | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Joe Tawney
|
|
|
OK on supply line flush 9/6/2001 11:55:30 AM
|
INSP-Supply line flush | 7/5/2001 | 7/6/2001 | 7/6/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover supply line 7/6/2001 2:31:54 PM
|
INSP-Supply line flush | 6/15/2001 | 6/18/2001 | 6/18/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover under slab main and riser stub in to bldg 6/18/2001 2:19:09 PM
|
INSP-Supply line flush | 4/13/2001 | 4/16/2001 | 4/16/2001 | A | PART |
Joe Tawney
|
|
|
4/16/2001 1:32:21 PM Ok to cover underslab main on bldg #2 4/16/2001 1:33:14 PM
|