INSP-Final Inspection | 6/25/2001 | 6/25/2001 | 6/25/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/25/2001 at 11:03:02. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 6/21/2001 | 6/22/2001 | 6/22/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 16:29:20. Contact: ###-####. combustible framing by electrical room requires coverage 6/22/2001 2:16:53 PM
|
INSP-Final Inspection | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Joe Tawney
|
|
|
OK on spklr rough exc unused area. 2 or 3 heads to be added. Also spklr monitoring to be upgraded. Need commitment letter from bldg owner. 6/21/2001 9:22:03 AM
|
INSP-Sprinkler Rough-in/Hydro | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | FAIL |
Joe Tawney
|
|
|
Spklr rough in Fail C/N issued Not approved for cover 6/20/2001 10:46:43 AM
|
INSP-Sprinkler Rough-in | 5/24/2001 | 5/25/2001 | 5/25/2001 | A | FAIL |
Rick Jackson
|
|
|
becky ###-#### couldn't locate plans 5/25/2001 2:01:55 PM
|