INSP-Sprinkler Rough-in/Hydro | 10/25/2001 | 10/26/2001 | 10/26/2001 | P | CANC |
Troy Cobbley
|
|
|
Approved plans not on site. Contractor to reschedule 10/26/2001 3:54:50 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 13:10:18. Contact: ###-####. hydro on wet system okay 8/31/2001 11:09:53 AM
|
INSP-Final Inspection | 8/20/2001 | 8/22/2001 | 8/22/2001 | A | PART |
Joe Tawney
|
|
|
ok ON SUPPLY LINE FLUSH 8/22/2001 11:14:23 AM
|
INSP-Supply line flush | 5/16/2001 | 5/17/2001 | 5/17/2001 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 14:56:48. Contact: ###-####. OK to cover riser stub in to bldg 5/17/2001 9:58:40 AM
|
INSP-Supply line flush | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 10:54:05. Contact: ###-####. OK to cover supply line 5/17/2001 2:31:45 PM
|