INSP-Final Inspection | 12/4/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 12/4/2001 11:34:39 AM UG fire line finaled
|
INSP-Final Inspection | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | FAIL |
Troy Cobbley
|
|
|
Provide sign on main exit door "Do not lock", repair exit and emergency lights, relocate one exit light and delete the other in the break room, add one sprinkler head in office, test overhead door. 11/30/2001 5:10:32 PM
|
INSP-Final Inspection | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | FAIL |
Troy Cobbley
|
|
|
Provide sign on main exit door "Do not lock", repair exit and emergency lights, relocate one exit light and delete the other in the break room, add one sprinkler head in office, test overhead door. 11/30/2001 5:10:32 PM
|
INSP-Supply line flush | 11/13/2001 | 11/13/2001 | 11/13/2001 | A | PART |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/13/2001 10:45:00 AM Underground hydro and flushed
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PART |
Joe Tawney
|
|
|
OK to cover spklr supply line 8/17/2001 4:00:27 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PART |
Joe Tawney
|
|
|
OKI to cover riser stub in to bldg 8/3/2001 12:07:43 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PART |
Joe Tawney
|
|
|
OK to cover riser stub in to bldg 8/6/2001 7:56:40 AM
|