INSP-Final Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/5/2001 1:30:30 PM OK for perm occ
|
INSP-Final Inspection | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | CANC |
Troy Cobbley
|
|
|
Cancelled by contractor 11/1/2001 7:44:54 AM
|
INSP-Final Inspection | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | NR |
Troy Cobbley
|
|
|
Not ready for final. Alarm system and outside canopy to be finished. 10/29/2001 4:00:12 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PASS |
Troy Cobbley
|
|
|
Aboveground hydro test OK 10/29/2001 4:00:31 PM
|
INSP-Final Inspection | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PART |
Troy Cobbley
|
|
|
Contractor corrected problems. Rough-in now OK 10/25/2001 2:24:10 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Joe Tawney
|
|
|
see c/n 10/10/2001 9:38:02 AM
|
INSP-Sprinkler Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | A | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/17/2001 10:16:18 AM Ok to cover concealed spaces at entry ways at East and West sides
|