INSP-Final Inspection | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/26/2002 4:20:16 PM
|
INSP-Final Inspection | 2/25/2002 | 2/25/2002 | 2/25/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/25/2002 10:55:01 AM need hydro and 911 on bell 2/25/2002 11:00:07 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/25/2002 2:20:00 PM overhead hydro okay
|
INSP-Sprinkler Rough-in | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/21/2001 3:34:29 PM okay to cover
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2001 | 11/20/2001 | 11/20/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### SHELLEY tenting; head not installed on third floor; plans; heads too close to lights at top of stairs 11/20/2001 7:16:35 PM
|
INSP-Sprinkler Rough-in | 11/16/2001 | 11/19/2001 | 11/19/2001 | P | NR |
Rick Jackson
|
|
|
shelly ###-#### r/i they will reschedule for 11/20/01. 11/19/2001 11:53:26 AM
|
INSP-Sprinkler Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Rick Jackson
|
|
|
###-#### underground flush only - pass 10/10/2001 3:16:23 PM
|
INSP-Sprinkler Rough-in | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | NR |
Rick Jackson
|
|
|
mike ###-#### underground
|