Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR01-00562
StatusExpired
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3201 W AIRPORT WAY
Project NameSPR AIRPORT-NEW TERMINAL UG
Customer Number 
ePlanReview 
Description
BOISE AIRPORT PASSENGER TERMINAL BUILDING UNDERGROUND - TO INSTALL A 12" FIRE SERVICE MAIN TIED INTO AN EXISTING 12" WATER PURVEYORS LINE, INTO THE NEW 45,000 BASEMENT. ALSO TO INSTALL A 12" LINE FROM THE BASEMENT OUT TO THE CURB SITE LOCATION FIRE PUMP TEST HEADER AND PROPOSED FIRE DEPARTMENT CONNECTION. ALL RELATED UNDERGROUND WORK SHALL BE PER APPROVED PLANS, UFC, NFPA 13-1999, 24-1995, STATE LAWS, AND STATE FIRE MARSHALL DIRECTIVES AS ADOPTED AND REGULATED BY THE BOISE FIRE DEPARTMENT. THIS PERMIT IS ATTACHED TO BUILDING PERMIT BLD00-03428.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro4/30/20024/30/20024/30/2002PPASS
DetailsTroy Cobbley
zone 12 and 13 underground flush and hydro test OK (6" and 12") 5/1/2002 12:41:10 PM
INSP-Sprinkler Rough-in4/15/20024/15/20024/15/2002PPART
DetailsRick Jackson
r/i sam ###-#### the 6 inch lines for future concourse are okay to cover; will need one more section to complete. will require flush and hydro 4/15/2002 3:03:40 PM
INSP-Sprinkler Rough-in3/8/20023/8/20023/8/2002PPART
DetailsRick Jackson
sam ###-#### underground insp two six inch stubbed out of south wall; approximately 50 foot in length okay to cover 3/8/2002 3:08:07 PM
INSP-Sprinkler Rough-in/Hydro1/14/20021/14/20021/14/2002PPART
DetailsRick Jackson
for under ground mike-- ###-#### underground hydro complete; flush will occur at future date when drains are ready 1/14/2002 2:15:56 PM
INSP-Sprinkler Rough-in/Hydro12/26/200112/26/200112/26/2001PNR
DetailsTroy Cobbley
Underground pipe flange wouldn't hold pressure 12/26/2001 3:20:34 PM
INSP-Sprinkler Rough-in/Hydro12/20/200112/20/200112/20/2001PNR
DetailsRick Jackson
UNDERGROUND\###-#### will reschedule for later date 12/20/2001 1:17:03 PM
INSP-Sprinkler Rough-in12/17/200112/18/200112/18/2001PPART
DetailsRick Jackson
###-#### underground rough/in complete from building to main water feed; needs flush and hydro 12/18/2001 3:10:03 PM
INSP-Sprinkler Rough-in11/13/200111/14/200111/14/2001APART
DetailsRick Jackson
###-#### UNDERGROUND partial underground installed; need final 20 ft to building; okay to cover 11/14/2001 4:04:29 PM