Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR02-00024
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 900 W BOEING ST
Project NameSPR BOISE MOBILE EQUIPMENT
Customer Number 
ePlanReview 
Description
BOISE MOBILE EQUIPMENT * To extend an existing fire sprinkler system protecting and existing structure into approximately 6,240 ft/2 previously unprotected area. Addition coverage indicates a Ordinary Group II hazard protection design. This protection is where the quantity and combustibility of contents is moderate to high, stockpiles or approved rack/shelf storage of Class 1 through III commodities do not exceed 12'-0", Class IV to 10'-0", or Group A Plastics to 5'-0". (NFPA 13:2-1.2.2*, 7-2.3.2.2) Also installing a new 6" Febco backflow preventer with control valves. One shall be a wall mounted P.I. All fire sprinkler work per red-lined notes, attached plan review comments and conditions; as regulated by fire department, which comprises and becomes a part of the approved plans. A fire "inspection card" is required as a condition of this permit, to provide witness compliance with adopted codes & ordinances. This fire permit is not attached to any building permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/15/20113/15/20113/15/2011PPASS
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro3/10/20113/10/20113/15/2011PDONE
DetailsForrest France
FIR-Aging Inspection3/7/20113/7/20113/10/2011 PASS
DetailsForrest France
FIR-Aging Inspection12/8/201012/8/201012/8/2010 PASS
DetailsForrest France
FIR-Aging Inspection9/1/20109/1/20109/1/2010 PASS
DetailsForrest France
Permit activity notes indicate work has been finished.
FIR-Aging Inspection6/21/20106/21/20106/23/2010 DONE
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro4/23/20034/29/20034/29/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/23/2003 at 9:44:42 AM. Contact: ###-####. all items completed from previouscorrection notice okay; hydro completed okay; awaiting completion of alarm permit 4/29/2003 2:58:25 PM
INSP-Final Inspection1/2/20031/6/20031/6/2003AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/02/2003 at 09:09:21. Contact: ###-####. plans show new electric bell and it isn't installed; plans show Febco BFP and Wilkins is installed - provide calcs as shown on review notes; need aux drain signs in shop drains; need supply side gauge; need spare heads in head box; need straps in shop area; need hydro test; need to test alarms 1/6/2003 9:38:53 AM
FIR-Aging Inspection12/26/200212/26/200212/30/2002 PART
DetailsRick Jackson
called and talked to Jim Danes; he thought this was inspected and signed off but will look into it 12/30/2002 1:35:09 PM