INSP-Final Inspection | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Troy Cobbley
|
|
|
Upon visual inspection I found that the work had either been installed and later removed or never installed at all. The doors as shown on the plans do not exist.
|
FIR-Aging Inspection | 9/27/2005 | 10/7/2005 | 10/11/2005 | A | NR |
Troy Cobbley
|
|
|
Per Charlie, Ronnie is getting drawings from the city archives and will call in the inspections.
|
FIR-Aging Inspection | 9/26/2005 | 9/26/2005 | 9/27/2005 | | DONE |
Troy Cobbley
|
|
|
I spoke to John in maintenance and Kirk in safety about getting this permit finaled.They spoke to Charlie at Simplex with me present and Charlie stated he would follow up. I set up a follow up inspection for 10/7/05.
|
INSP-Conference | 6/16/2005 | 6/29/2005 | 6/28/2005 | P | NR |
Troy Cobbley
|
|
|
Per Thad Simplex is to contact me for job status.
|
FIR-Aging Inspection | 6/15/2005 | 6/15/2005 | 6/16/2005 | | DONE |
Troy Cobbley
|
|
|
I spoke to Thad about job status. He is to investigate. Followup inspection setup for the 29th
|
FIR-Aging Inspection | 1/1/2003 | 1/1/2003 | 1/1/2003 | | NR |
Troy Cobbley
|
|
|
I spoke to Wes with Synergy Engineering and he said he would verify that the work was done and call for an inspection 1/6/2003 12:12:40 PM
|