Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR02-00123
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 298 W HALE ST
Project NameSPR UG BROOKSIDE APTS BLDG D1
Customer Number 
ePlanReview 
Description
Building D1 * To install an underground fire service main for a complete fire sprinkler system within a new 11,808 sq.ft. three story, wood framed, 12 unit apartment building, (under a separate permit). NOTE: This building is fully fire sprinklered with a NFPA 13 System per alternate signed & approved by Tim Hogland for second exit from the third floor. Each floor is 3,936 sq.ft. and contains 2 - two bedroom, two bath units and 2 - one bedroom, one bath units. All installation, materials testing, flushing per NFPA 13-1999, 24-1995, approved plans and attached comment list as regulated by the Fire Department. This permit is attached to building permit: BLD02-00323.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/10/200210/10/200210/10/2002PPASS
DetailsRick Jackson
INSP-Sprinkler Rough-in/Hydro10/4/200210/4/200210/4/2002PPART
DetailsRick Jackson
re-test on dry line: wet and dry re-charged to 200+; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro okay on overhead systems 10/4/2002 4:54:07 PM
INSP-Sprinkler Rough-in/Hydro10/3/200210/3/200210/3/2002PFAIL
DetailsRick Jackson
overhead hydro both wet and dry in building 1; Phone #: ###-#### Internet Inspection Request from: Trent Bice both systems dropped pressure 10/3/2002 4:27:02 PM
INSP-Sprinkler Rough-in/Hydro9/30/200210/1/200210/1/2002APART
DetailsRick Jackson
Bldg 1 Supply line hydro.; Phone #: ###-#### Internet Inspection Request from: Trent Bice supply line hydro okay 10/1/2002 1:50:26 PM
INSP-Supply line flush7/9/20027/10/20027/10/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/09/2002 at 12:11:38. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro6/19/20026/20/20026/21/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/19/2002 at 08:48:35. Contact: ###-####. okay to cover 6/21/2002 10:28:07 AM
INSP-Supply line flush6/5/20026/10/20026/10/2002APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/05/2002 at 09:53:12. Contact: ###-####. underground flush okay; still need hydro test 6/10/2002 3:50:48 PM
INSP-Supply line flush4/18/20024/18/20024/18/2002PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/18/2002 at 10:15:48. Contact: ###-####. supply line cover only - okay to cover 4/18/2002 4:11:36 PM
INSP-Supply line flush4/12/20024/12/20024/12/2002PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/12/2002 at 09:57:05. Contact: ###-####.