INSP-Final Inspection | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/14/2002 at 11:00:10. Contact: ###-####. underground hydro okay 10/14/2002 3:01:57 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2002 | 9/27/2002 | 9/27/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/26/2002 at 15:49:20. Contact: ###-####. need EQ in locker room and on anti-freeze loop; head gaurds in southwest stair and in storage rooms; head overspaced in locker room; need anti-freeze in system; need alarm plans submitted for new tampers/flows; plans show ball drip in pit for FDC 9/27/2002 2:37:07 PM
|
INSP-Supply line flush | 9/20/2002 | 9/23/2002 | 9/23/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 09:02:15. Contact: ###-####. underground flush okay; still need hydro on underground 9/23/2002 10:29:54 AM
|
INSP-Supply line flush | 9/16/2002 | 9/17/2002 | 9/17/2002 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 12:25:08. Contact: ###-####. called Shilo office and they said no one was at the job site and they would recall an inspection 9/17/2002 4:07:11 PM
|
INSP-Sprinkler Rough-in | 9/13/2002 | 9/13/2002 | 9/13/2002 | P | PART |
Rick Jackson
|
|
|
underground completed to basement wall; depth of bury will be 3 ft where it passes from exterior wall to basement wall; will need to flush and hydro
|
INSP-Supply line flush | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 08:04:58. Contact: ###-####. cover inspection for UG cover - okay to cover partial lay of new line; stubbed from street to within 10 feet of building; FDC is run in same trench and same distance from building 8/20/2002 10:17:53 AM
|
INSP-Conference | 8/19/2002 | 8/19/2002 | 8/19/2002 | P | FAIL |
Rick Jackson
|
|
|
BUDDY ###-#### ( UNDERGROUND WATER SUPPLY ) need tracer wire, conduit for tamper on PIV ends of pipe capped 8/19/2002 4:14:37 PM
|