Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR02-00303
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 205 N 10TH ST Unit: 600
Project Namealm-EMPIRE BLDG-6TH FLR
Customer Number 
ePlanReview 
Description
EMPIRE BLDG-6TH FLR - To modify the existing building fire alarm system by adding manual pull stations, supplimentary area smoke detection, induct smoke detectors for heat pump air handler shut down and a/v notification devices, to meet current Code within the TI project being done on the 6th floor. This permit also includes the relocation of improperly located existing alarm devices on the 5th floor. The devices to be relocated on the 5th floor are designated on the plans as "as built" modifications, although these modifications will not be made until this permit is issued. The permit also includes plan modifications to reflect "as built" circuit wiring on existing a/v circuits which were discovered to have not been wired in accordance with previously approved plans.
The associated building permit (BLD 02-00259) is to construct a 7,200 square foot office tenant space on the 6th floor of the Empire Building. This tenant will occupy the entire floor. The floor structure in one area is being reinforced for storage loading. Work is to include interior nonbearing walls, interior doors, interior windows, suspended ceilings, millwork, and interior finishes all per approved drawings, engineering, and plan review conditions on file. This building is fire sprinklered under the provisions of the 1994 UCBC because it is too tall, too big, and has too many stories. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing8/23/20028/23/20028/23/2002PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/23/2002 at 07:55:52. Contact: ###-####.
INSP-Final Inspection8/23/20028/23/20028/23/2002APASS
DetailsRick Jackson
INSP-Alarm Testing8/20/20028/20/20028/20/2002PFAIL
DetailsRick Jackson
###-#### plans don't match what is installed; devices don't match address on plans; need 75 cd strobes as shown on plans; move horn to 96 inches at south end due to shelf; update drawings 8/20/2002 3:10:21 PM