INSP-Final Inspection | 12/2/2002 | 12/3/2002 | 12/3/2002 | A | PASS |
Rick Jackson
|
|
|
###-####
|
INSP-Final Inspection | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | FAIL |
Rick Jackson
|
|
|
tampers at anti-freeze system not supervised
|
INSP-Final Inspection | 9/25/2002 | 9/25/2002 | 9/25/2002 | P | NR |
Troy Cobbley
|
|
|
contractor still needs to change out the extended coverage pendant located on the second floor, insulation still needs to be provided at deck and bottom part of overbuilds. The upper part of the overbuilds have been filled with insulation as well as the concealed spaces beneath the windows 9/25/2002 2:40:31 PM
|
INSP-Final Inspection | 9/11/2002 | 9/11/2002 | 9/11/2002 | P | PART |
Troy Cobbley
|
|
|
hydro test of the sprinkler piping is OK, but for the roughin, the insulation needs to be installed at the deck or the uprights need to be raised, fill all of the combustible concealed spaces with insulation or provide sprinkler heads (these spaces are on the 2nd floor), replace extended coverage head on the second floor with a standard head, install the remaining earth quake bracing 9/11/2002 2:57:50 PM
|