Permit NumberFIR02-00318
StatusFinaled
Name RONALD MC DONALD HOUSE
Site Address 101 E WARM SPRINGS AVE
Project NameRONALD MCDONALD HOUSE
Customer Number 
ePlanReview 
Description
*Ronald McDonald House Addition* To extend and existing fire sprinkler system in a 3,600 ft/2 two story, 7 guest sleeping rooms with bathrooms and a kitchen addition to an existing facility. Construction work also involves renovating the existing 13-guest bedroom and removal of existing living room on the south end for new addition. All construction per the approved plans and the attached comment list. NOTE: This building is fully fire sprinklered for one-hour substitution. The fire sprinkler system work shall comply with NFPA 13?1999, attached review comment and conditions list; as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-00175.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/2/200212/3/200212/3/2002APASS
DetailsRick Jackson
###-####
INSP-Final Inspection12/2/200212/2/200212/2/2002PFAIL
DetailsRick Jackson
tampers at anti-freeze system not supervised
INSP-Final Inspection9/25/20029/25/20029/25/2002PNR
DetailsTroy Cobbley
contractor still needs to change out the extended coverage pendant located on the second floor, insulation still needs to be provided at deck and bottom part of overbuilds. The upper part of the overbuilds have been filled with insulation as well as the concealed spaces beneath the windows 9/25/2002 2:40:31 PM
INSP-Final Inspection9/11/20029/11/20029/11/2002PPART
DetailsTroy Cobbley
hydro test of the sprinkler piping is OK, but for the roughin, the insulation needs to be installed at the deck or the uprights need to be raised, fill all of the combustible concealed spaces with insulation or provide sprinkler heads (these spaces are on the 2nd floor), replace extended coverage head on the second floor with a standard head, install the remaining earth quake bracing 9/11/2002 2:57:50 PM