INSP-Final Inspection | 2/27/2003 | 2/27/2003 | 2/27/2003 | P | PASS |
Rick Jackson
|
|
|
|
INSP-Sprinkler Rough-in | 2/19/2003 | 2/20/2003 | 2/20/2003 | A | PASS |
Rick Jackson
|
|
|
43 psi air test okay on dry air test 2/20/2003 9:39:42 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/18/2003 | 2/19/2003 | 2/19/2003 | A | PART |
Rick Jackson
|
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie started 24 hr air test at 43 psi. 2/19/2003 10:27:25 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/13/2003 | 2/14/2003 | 2/14/2003 | A | FAIL |
Rick Jackson
|
|
|
###-#### complete 24 hr air test fail - pressure down to 35 psi 2/14/2003 9:04:35 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/12/2003 | 2/13/2003 | 2/13/2003 | A | PART |
Rick Jackson
|
|
|
###-#### eric started 24 hr test - pressure at 41 psi'; will return tomorrow at 10 am 2/13/2003 11:06:22 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2003 | 1/9/2003 | 1/9/2003 | P | PART |
Rick Jackson
|
|
|
above grnd. ###-#### above ground hydro okay 1/9/2003 1:17:06 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | FAIL |
Rick Jackson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung partial r/i as not all heads are completed; need high temp head at heater in west bay; heads obstructed by cabinets in 2 sleeping rooms on south side; main missing hanger in west bay; need head in electrical room; need drum drip on inspectors test 1/7/2003 11:33:05 AM
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2003 | 1/7/2003 | 1/7/2003 | A | PART |
Rick Jackson
|
|
|
UG hydro okay
|
INSP-Supply line flush | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | PASS |
Troy Cobbley
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
INSP-Sprinkler Rough-in/Hydro | 11/4/2002 | 11/5/2002 | 11/5/2002 | A | FAIL |
Rick Jackson
|
|
|
###-#### james need to get heads closer to deck with sprigs on east hall by stalls prior to covering (obstructions by duct, etc.) 11/5/2002 11:37:37 AM
|
INSP-Sprinkler Rough-in | 10/16/2002 | 10/17/2002 | 10/17/2002 | P | PART |
Rick Jackson
|
|
|
###-#### second floor okay to cover 10/17/2002 4:44:52 PM
|
INSP-Supply line flush | 9/6/2002 | 9/9/2002 | 9/9/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 15:27:23. Contact: ###-####. not flush; cover inspection for the underground only - okay to cover, 6 inch ran from building to property line 9/9/2002 4:00:40 PM
|