Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR02-00380
StatusFinaled
Name PROTEX
Site Address 255 N STEELHEAD WAY
Project Namealm-SCP GLOBAL TECHNOLOGIES -
Customer Number 
ePlanReview 
Description
SCP GLOBAL TECHNOLOGIES - Rack storage area - To add monitoring of a new electric fire pump and associated new valves, and to add horn/strove coverage in the rack storage area, powered from a new NAC power extender panel, all connected to the existing building fire alarm system.
The associated building permit (BLD 02-00752) is to install storage racks within two separate storage areas, one area of 11,968 sq ft and one area of 4,407 sq ft. Work to include, relocation of one 20 minute rated exit door and patching corridor wall, and installation of low rack storage in Warehouse #103 and receiving area #104/ (Warehouse area # 134), installation of 340 lf of 20 ft high, 6 ft wide wire shelving, 302 lf 16 ft high pallet racking, 52 lf of 17'8" high carousel storage, 60 lf ft of 16 ft high pallet storage above 6' storage racks, and miscellaneous 6 ft to 8 ft high storage.
The associated fire sprinkler permit (FIR02-00307) is to install upgrade fire protection for miscellaneous single & double row pallet racks (no solid shelves), incorporating the storage of Class IV, non-encapsulated commodities with 6'-0"+ aisles widths, to a maximum 22'-0" elevation, within two separate storage areas. One area is 11,968 ft/2 and the other area is 4,407 ft/2. Work to include, the modification of existing wet system riser for the installation of a 1500gpm/100 psi 125 horsepower Fire Booster Pump with Controller, 2 horsepower Jockey Pump with Controller, removing 169 existing heads and replacing with, Central Model K17-231 Standard Response/Standard Coverage sprinklers, installing approximately 235 feet of 4" bulk main and 126 feet of cross main, connected to the existing south side gridded lines.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/30/20035/2/20035/2/2003PDONE
DetailsTroy Cobbley
Inspection already finaled 5/2/2003 3:34:33 PM
INSP-Final Inspection5/2/20035/2/20035/2/2003PPASS
DetailsTroy Cobbley
INSP-Final Inspection3/12/20033/13/20033/13/2003AFAIL
DetailsTroy Cobbley
###-#### dean The existing notification circuit still needs repaired. 3/13/2003 11:18:53 AM
INSP-Final Inspection2/7/20032/13/20032/13/2003AFAIL
DetailsTroy Cobbley
Phone #: ###-#### Provide verification of dedicated circuit to the NAC panel, provide device map for the fire alarm system, a/v's in the area outside of the scope of work are not operating correctly and need corrected (continous tone/non-sycned) 2/13/2003 9:06:19 AM
FIR-Aging Inspection1/8/20031/8/20031/8/2003 NR
DetailsTroy Cobbley
I spoke to Rob with Protex last week when I did the fire sprinkler final and he said that they were not quite ready for a final but would be setting up an inspection within the next couple of weeks 1/9/2003 10:15:27 AM