Permit Number | FIR02-00398 |
Status | Finaled |
Name |
PROTEX
|
Site Address |
150 N CAPITOL BLVD
|
Project Name | ALM-CITY HALL EXPANSION4thFL |
Customer Number | |
ePlanReview | |
Description |
CITY HALL EXPANSION-3rd & 4th Flrs - To modify the existing building fire alarm system to provide code compliant alarm coverage for the TI remodel projects on the 3rd and 4th floors.
The associated building permits are Bld02-00579 (3rd flr) and BLD02-00938 (4th flr). The address was changed from 650 W. Main to 150 N. Capital, during the permitting period, resulting in earlier permits being issued to the 650 W. Main address and latter permits issued to 150 N. Capital.
BLD02-00579 (BOISE CITY HALL-3RD FLR/FIRE DEPT & POLICE INTERNAL AFFAIRS) is to perform selective demolition of entire 3rd floor. To remodel the 13,183 sq. ft. area for use as administrative offices & conference rooms. To construct new interior, non-bearing, non-combustible, fire-resistive walls to create new office areas & conference rooms; to upgrade restrooms for compliance with accessibility; modify suspended ceiling system, electrical, mechanical, plumbing, sprinkler & alarms systems as necessary to meet tenants needs and comply with adopted building codes.
BLD02-00938 (BOISE CITY HALL-4TH FLR/LEGAL DEPARTMENT) is to perform selective demolition of the entire 4th floor. To remodel the 12,231 sq. ft. area for use as administrative offices of the legal department. To construct new interior, non-bearing, non-combustible, fire-resistive walls to create new office areas, reception & conference rooms; to upgrade restrooms for accessibility compliance; modify suspended ceiling system, electrical, mechanical, plumbing, sprinkler & alarm systems as necessary to meet the needs of the tenant and to be in compliance with adopted City of Boise building codes.
|