Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberFIR02-00405
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 12601 W EXPLORER DR
Project NameSPR Brighton Plaza Shell/Core
Customer Number 
ePlanReview 
Description
Brighton Plaza Office Shell & Core Building - To install 233'-0" of C-900 PVC underground fire line supply from the property line off Lasalle St., into the mechanical room on the South Side of the shell structure. Also includes the installation of a Light Hazard Occupancy, "Wet" designed system throughout the two story, type VN, 41,472 ft/2 shell and core office building. First floor is 20,559 ft/2 and the second floor is 20,913 ft/2. Fire sprinkler protection is used for area increase. The fire sprinkler system work shall comply with NFPA 13-1999, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD02-02706. No occupancy is allowed under this permit. Separate plans and permits shall be required for each tenant space.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/18/20038/18/20038/18/2003PPASS
DetailsTroy Cobbley
INSP-Sprinkler Rough-in/Hydro3/7/20033/10/20033/10/2003PPASS
DetailsTroy Cobbley
above ground hydro test is OK 3/10/2003 3:24:28 PM
INSP-Sprinkler Rough-in/Hydro3/3/20033/4/20033/4/2003APART
DetailsTroy Cobbley
underground hydro test is ok. Above ground hydro test failed. It appears to be leaking in the elevator lobby 3/4/2003 12:27:22 PM
INSP-Sprinkler Rough-in2/14/20032/14/20032/14/2003PPART
DetailsTroy Cobbley
john; Phone #: ###-#### Sprinkler piping is ok to cover below the stairs and in the areas around the stairs 2/14/2003 3:19:02 PM
INSP-Sprinkler Rough-in1/17/20031/17/20031/17/2003PPASS
DetailsTroy Cobbley
sprinkler heads in high area of main lobby ok to cover 1/17/2003 3:11:24 PM
INSP-Sprinkler Rough-in12/12/200212/13/200212/13/2002APART
DetailsTroy Cobbley
hard lid areas are ok to cover. Sprinkler heads need to be added over the egress corridor and the other rooms where there are no uprights. This is in locations where there is not a tenant on either side of these rooms. I spoke to Greg at Treasure Valley Fire about this. A sprinkler head needs to be added under the 2nd floor stairs 12/13/2002 1:23:59 PM
INSP-Supply line flush11/25/200211/26/200211/26/2002APASS
DetailsTroy Cobbley
supply line flush ok 11/26/2002 11:01:22 AM