INSP-Final Inspection | 2/19/2003 | 2/20/2003 | 2/20/2003 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping finaled 2/20/2003 3:39:46 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | PASS |
Troy Cobbley
|
|
|
sprinkler rough in and hydro test of the overhead system is ok 12/23/2002 1:33:33 PM
|
INSP-Sprinkler Rough-in/Hydro | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | PASS |
Troy Cobbley
|
|
|
sprinkler rough in and hydro test of the overhead system is ok 12/23/2002 1:33:33 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2002 | 11/22/2002 | 11/22/2002 | A | PART |
Troy Cobbley
|
|
|
underground hydro is ok and the underground flush is ok 11/22/2002 2:46:06 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/14/2002 | 11/15/2002 | 11/15/2002 | P | PASS |
Troy Cobbley
|
|
|
underground pipe OK to cover 11/15/2002 3:22:09 PM
|