INSP-Final Inspection | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
FIR-Aging Inspection | 9/27/2005 | 10/7/2005 | 10/11/2005 | A | NR |
Troy Cobbley
|
|
|
Per Charlie, Ronnie is getting drawings from the city archives and will call in the inspections.
|
FIR-Aging Inspection | 9/26/2005 | 9/26/2005 | 9/27/2005 | | DONE |
Troy Cobbley
|
|
|
I spoke to John in maintenance and Kirk in safety about getting this permit finaled.They spoke to Charlie at Simplex with me present and Charlie stated he would follow up. I set up a follow up inspection for 10/7/05.
|
FIR-Aging Inspection | 6/17/2005 | 6/17/2005 | 6/20/2005 | | DONE |
Forrest France
|
|
|
Called Grinnell and spoke with Ronnie about the need to final this aging permit. He will contact Chris and take the necessary steps for a final.
|
INSP-Final Inspection | 3/1/2004 | 3/2/2004 | 3/2/2004 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the pre-action system. Connect the tamper switch on the valve controling the "hose system" to the fire alarm panel on the first floor (it needs to annunciate separately). The sprinkler contractor needs to verify what the valve actually controls. Change control valve text to correctly identify the pre-action control valve 3/2/2004 3:37:42 PM
|
INSP-Final Inspection | 3/10/2003 | 3/12/2003 | 3/12/2003 | A | FAIL |
Troy Cobbley
|
|
|
Could not test the valve because no one could find the key for the chain lock 3/12/2003 3:16:14 PM
|
FIR-Aging Inspection | 3/6/2003 | 3/6/2003 | 3/6/2003 | | FAIL |
Troy Cobbley
|
|
|
I contacted Chris with SimplexGrinnell and he stated that he thought that the job had been completed but he would follow up and call in an inspection 3/7/2003 9:19:46 AM
|