INSP-Final Inspection | 8/18/2003 | 8/18/2003 | 8/18/2003 | P | PASS |
Troy Cobbley
|
|
|
|
INSP-Alarm Testing | 4/8/2003 | 4/9/2003 | 4/9/2003 | P | PART |
Troy Cobbley
|
|
|
duct smoke detectors tested out OK 4/9/2003 4:02:21 PM
|
INSP-Alarm Testing | 4/7/2003 | 4/8/2003 | 4/8/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 1:38:39 PM. Contact: ###-####. Security Group called and said they will reschedule for 4/9/03 4/8/2003 1:44:31 PM
|
INSP-Alarm Testing | 4/4/2003 | 4/7/2003 | 4/7/2003 | P | PART |
Troy Cobbley
|
|
|
elevator recall is ok 4/7/2003 3:46:22 PM
|
INSP-Final Inspection | 3/27/2003 | 3/31/2003 | 3/31/2003 | A | FAIL |
Troy Cobbley
|
|
|
MIKE 8AM INSPECTION; Phone #: ###-#### test all recall functions for the elevator including all heat and smoke detectors, provide smoke for all fire smoke dampers per review note #6, provide duct smoke detectors on the supply side of the HVAC units or get permission from the boise fire dept. to leave them on the return side, provide a map of system 3/31/2003 9:40:44 AM
|
FIR-Aging Inspection | 3/18/2003 | 3/18/2003 | 3/18/2003 | | NR |
Troy Cobbley
|
|
|
Mike with the Security Group left a message on my voice mail stating that an inspection would be called in later this week 3/19/2003 7:55:05 AM
|