Permit Information
Permit NumberFIR03-00070
StatusFinaled
Name HONEYWELL INC
Site Address 190 E BANNOCK ST
Project NameALM-SLRMC 2 NORTH WING & EAST
Customer Number 
ePlanReview 
Description
SLRMC 2 NORTH WING & EAST TOWER LABOR & DELIVERY TRIAGE) - To modify the existing building fire alarm system within the TI area, as shown on approved plans. Work includes relocation and addition of area smoke detection, new induct detector for smoke damper release, pull station and door holders, and a new NAC panel with 2 new a/v circuits on existing FACP #6; and replacement of three existing smoke detectors on FACP # 8.
The associated building permit (BLD 02-02815) is to remodel approximately 4,950 sq.ft. of the existing "I-1.1" occupancy area per approved plans & attached plan review comments & conditions on file. Work to include selective demolition of interior walls, ceiling systems, floor finishes, fixtures, cabinetry & utilities; construction of new non-combustible, non-bearing fire-resistive walls to create the 1-hour exit corridor, waiting, reception, exam and support area rooms; install new suspended grid ceiling system; upgrade electrical, plumbing, mechanical, fire suppression and alarm systems to meet tenant needs and meet current adopted city codes & ordinances. A "Certificate of Occupancy" is required as a condition of this permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/16/20041/20/20041/20/2004APASS
DetailsRick Jackson
###-#### all notification and smoke detectors within this space are on the 2 east panel; the sprinklers are still on the other building zone and plans/installation are in progress 1/20/2004 11:35:34 AM
INSP-Final Inspection11/12/200311/13/200311/13/2003AFAIL
DetailsRick Jackson
8:00 am not installed per plans; the area at the south expansion joint is on another alarm system 11/13/2003 11:17:02 AM
INSP-Final Inspection11/10/200311/12/200311/12/2003ACANC
DetailsRick Jackson
mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
INSP-Final Inspection8/5/20038/6/20038/6/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/5/2003 at 9:55:05 AM. Contact: ###-####. this a phased project; phase 1okay; NAC's will be per plans after phase two 8/6/2003 12:33:44 PM
INSP-Final Inspection7/31/20038/1/20038/1/2003AFAIL
DetailsRick Jackson
###-#### need detectors for damper release of clean linen room occupancy separation; audible alarm in corridor is barely audible 8/1/2003 10:58:07 AM
INSP-Final Inspection7/29/20037/30/20037/30/2003PFAIL
DetailsRick Jackson
mark; Phone #: ###-#### Internet Inspection Request from: Annette Moore smoke/fire dampers need to comply with UBC 713 on how to operate the dampers with detectors; changes made to device numbers; this permit is being phased and NAC are not installed per plans 7/30/2003 4:49:58 PM
FIR-Aging Inspection6/5/20036/5/20036/5/2003 PART
DetailsRick Jackson
work in progress 6/5/2003 7:14:21 AM