INSP-Final Inspection | 5/14/2003 | 5/14/2003 | 5/14/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/14/2003 at 11:09:18 AM.
|
INSP-Final Inspection | 5/13/2003 | 5/13/2003 | 5/13/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 8:15:00 AM. Contact: ###-####. no provisions for inspectors test to drain outside - owner wants hose bib to run outside; main shut off after domestic shutoff is to be removed 5/13/2003 1:20:39 PM
|
INSP-Final Inspection | 5/9/2003 | 5/9/2003 | 5/12/2003 | P | NH |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/9/2003 at 10:36:49 AM. Contact: ###-####. OWNER NOT HOME 5/12/2003 8:56:23 AM
|
INSP-Final Inspection | 5/7/2003 | 5/8/2003 | 5/8/2003 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/7/2003 at 1:32:25 PM. Contact: ###-####. need to test the water flow alarms; tlaked to Jim Danes and he will reschedule 5/8/2003 10:16:12 AM
|
INSP-Sprinkler Rough-in/Hydro | 4/3/2003 | 4/4/2003 | 4/4/2003 | A | PART |
Troy Cobbley
|
|
|
pendant drop in cellar exceeds 9' off of wall and 1" armover in basement needs hanger since its over 2' long 4/4/2003 11:10:45 AM
|
INSP-Sprinkler Rough-in/Hydro | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/2/2003 at 7:21:37 AM. Contact: ###-####. need plans; need nail plates where vertical CPVC passes through stud cavity; deflector bent (under stairs) 4/3/2003 8:53:16 AM
|