Permit Number | FIR03-00211 |
Status | Finaled |
Name |
MICRON TECHNOLOGY INC FP
|
Site Address |
8000 S FEDERAL WAY
|
Project Name | SPR MICRON #16 CLEANROOM |
Customer Number | |
ePlanReview | |
Description |
Micron Building #16 - To prepare the North half of the Assembly Cleanroom room 001E to support Fab 3 CFA production. Sprinkler work is related to construction of new dividing walls for air returns and service aisles. The fire sprinkler system work shall be installed in accordance to NFPA 13-1999, complying with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to garage shell permit: BLD03-00960.
|