INSP-Final Inspection | 6/25/2004 | 6/25/2004 | 6/25/2004 | A | PASS |
Rick Jackson
|
|
|
|
INSP-Final Inspection | 5/28/2004 | 6/1/2004 | 6/1/2004 | P | FAIL |
Rick Jackson
|
|
|
bob erland; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need NFPA 25 6/1/2004 3:59:30 PM
|
INSP-Final Inspection | 5/27/2004 | 5/27/2004 | 5/27/2004 | P | FAIL |
Troy Cobbley
|
|
|
No actual inspections were done. At the start of the fire sprinkler inspection I found that a different backflow preventor has been installed. Verification of friction loss is needed. Need NFPA 25. Provide verification that exposed cpvc sprinkler piping in the riser room is ok. Also per inspector 409 the fire sprinkler plans need to be resubmitted which has not been done yet according to the history available on the computer. Fire alarm plans need to be resubmitted due to changes in zones and notification circuitry.
|
FIR-Aging Inspection | 3/12/2004 | 3/12/2004 | 3/12/2004 | P | PASS |
Troy Cobbley
|
|
|
underground flush ok 3/12/2004 4:29:01 PM
|
INSP-Supply line flush | 3/11/2004 | 3/11/2004 | 3/11/2004 | P | CANC |
Troy Cobbley
|
|
|
United water could not find the water valve to turn on underground water supply 3/11/2004 3:36:47 PM
|
INSP-Sprinkler Rough-in | 8/20/2003 | 8/20/2003 | 8/20/2003 | P | PART |
Troy Cobbley
|
|
|
###-#### sprinkler piping is ok to cover on the third floor. I notified Bruce with Commercial fire that the sprinkler pendants located in the furnace rooms will need to be changed to 175 degrees 8/20/2003 4:11:09 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2003 | 6/17/2003 | 6/17/2003 | P | PASS |
Troy Cobbley
|
|
|
above ground hydro test is ok 6/17/2003 4:04:36 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/16/2003 | 6/16/2003 | 6/16/2003 | P | PASS |
Troy Cobbley
|
|
|
bruce; Phone #: ###-#### Underground supply line hydro test is OK 6/16/2003 1:47:56 PM
|
INSP-Sprinkler Rough-in | 6/12/2003 | 6/12/2003 | 6/12/2003 | P | PASS |
Troy Cobbley
|
|
|
Bruce with Commercial Fire called to say that they installed the trace wire in the trench with the underground supply piping but that the contractor had started to bury the piping. He stated that he has digital pictures showning the wire in the trench. I stopped at the project and found all of the underground piping buried. I spoke to Sam Rogers and he stated that in this case the digital pictures will work for proof of trace wire
|
INSP-Supply line flush | 6/5/2003 | 6/6/2003 | 6/6/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 11:52:44 AM. Contact: ###-####. not a flush; UG wasn't complete and will need a recall to cover as wire wasn't in trench also; need 175 degree heads as shown on plans in HW room; need nail plates on vertical pipe on all second floor; couldn't check 3rd floor; resubmittal for modification to UG required to Bill A.; they are going to resubmit about drains shown on plans 6/6/2003 9:33:59 AM
|