INSP-Sprinkler Rough-in/Hydro | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | PASS |
Rick Jackson
|
|
|
UG hydro okay 3/1/2004 5:20:56 PM
|
INSP-Supply line flush | 1/28/2004 | 1/28/2004 | 1/28/2004 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/28/2004 at 7:45:44 AM. Contact: ###-####. UG flush only - okay 1/28/2004 1:05:16 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2003 | 9/8/2003 | 9/8/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/8/2003 at 8:11:17 AM. Contact: ###-####. okay to cover up base of riser and 22 thrust block to west of riser 9/8/2003 12:50:06 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PART |
Troy Cobbley
|
|
|
The underground supply between both buildings is ok to cover 8/28/2003 8:11:49 AM
|
INSP-Sprinkler Rough-in | 6/10/2003 | 6/10/2003 | 6/10/2003 | A | PART |
Rick Jackson
|
|
|
okay to cover; need to flush and hydro test 6/10/2003 1:21:19 PM
|
INSP-Conference | 5/15/2003 | 5/16/2003 | 5/16/2003 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/15/2003 at 5:13:41 PM. Contact: ###-####. not ready for thrust blocks 5/16/2003 4:29:48 PM
|
INSP-Conference | 5/15/2003 | 5/16/2003 | 5/16/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/15/2003 at 5:14:16 PM. Contact: ###-####.this inspection was completed on 5/15 5/16/2003 10:09:09 AM
|
INSP-Sprinkler Rough-in | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | PART |
Rick Jackson
|
|
|
need thrust blocks; not installed to property line;
|