INSP-Final Inspection | 6/30/2003 | 6/30/2003 | 6/30/2003 | P | PASS |
Rick Jackson
|
|
|
detectors were preinstalled by the manufacturuer on the return side of both units complying with IMC 6/30/2003 1:31:50 PM
|
INSP-Final Inspection | 6/25/2003 | 6/27/2003 | 6/27/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/25/2003 at 6:56:30 AM. Contact: ###-####. rescheduled for 6/30 6/30/2003 8:59:13 AM
|