DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/26/200311/26/200311/26/2003PPASS
DetailsTroy Cobbley
INSP-Final Inspection10/10/200310/10/200310/10/2003PPART
DetailsTroy Cobbley
NAC panels had to be replaced due to excessive current draw. Manufacture sent out a temp. replacement panel that still draws more power than original design. New panels will be in within 5 days. The panels installed require 7.6 ah batteries to meet code. 7 ah are installed.
INSP-Final Inspection10/8/200310/8/200310/8/2003PFAIL
DetailsTroy Cobbley
update map in clubhouse, alarm signals are not correct and need to be redone, need 14.6 ah batteries in the nac panel 10/8/2003 3:35:57 PM
INSP-Final Inspection10/7/200310/7/200310/7/2003PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/7/2003 at 11:25:04 AM. Contact: ###-####. need to reschedule when other fire/life safety items are ready 10/8/2003 7:39:29 AM
INSP-Final Inspection10/3/200310/6/200310/6/2003AFAIL
DetailsTroy Cobbley
alarm contractor was not able to make inspection 10/6/2003 2:52:38 PM
INSP-Final Inspection9/30/20039/30/20039/30/2003PCANC
DetailsTroy Cobbley
wrong inspection called in 9/30/2003 3:49:55 PM