Permit Information
Permit NumberFIR03-00305
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 101 S CAPITOL BLVD Unit: 1400
Project NameSPR US BANK-14TH FLR
Customer Number 
ePlanReview 
Description
(HOLLAND & HART - 14TH FLOOR) To modify and add fire sprinklers for the remodel of an existing 11,930-ft/2 whole floor tenant space for the existing tenant. This space is located on the 15th floor (14,600 square feet) of an existing high-rise building. Work is related to new interior nonbearing walls and suspended ceilings. This building is fire sprinklered because it is a high-rise. All fire sprinklers and related appurtenance within this permit work scope shall meet current NFPA 13-1999 standards, comply with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, in order to provide witness verification of compliance in meeting minimum code standards. This permit is attached to building permit: BLD03-00436. Any work associated with the existing elevator lobby/corridor shall comply with the 1-hr corridor provisions of the 2000 IBC.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/22/20044/22/20044/22/2004PPASS
DetailsRick Jackson
INSP-Sprinkler Rough-in/Hydro3/18/20043/19/20043/19/2004APASS
DetailsRick Jackson
Tom ###-#### okay to cover; additional heads added at lobby due to finished ceiling height; will close this out final inspection to verify escutcheons 3/19/2004 10:15:27 AM
INSP-Sprinkler Rough-in/Hydro3/4/20043/5/20043/5/2004PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 3/4/2004 at 3:08:59 PM. Contact: ###-####. okay to cover lobby area 3/5/2004 3:26:37 PM
INSP-Sprinkler Rough-in11/25/200311/26/200311/26/2003APART
DetailsRick Jackson
phase one is okay to cover; see plans for area 11/26/2003 9:21:41 AM
INSP-Sprinkler Rough-in/Hydro11/25/200311/25/200311/25/2003PCANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/25/2003 at 8:54:25 AM. Contact: ###-####. rescheduled by inspector to 11/26 at 8:00 am 11/25/2003 4:49:13 PM
FIR-Aging Inspection9/10/20039/10/20039/10/2003 PASS
DetailsRick Jackson
wip 9/10/2003 7:59:29 AM