INSP-Final Inspection | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | PASS |
Troy Cobbley
|
|
|
michelle; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
|
INSP-Final Inspection | 8/6/2003 | 8/7/2003 | 8/7/2003 | P | FAIL |
Troy Cobbley
|
|
|
Phone #: ###-#### Repair the nac circuit, change text to supervisory for the remote tamper switches, provide verify zones labels 8/7/2003 2:46:26 PM
|
INSP-Final Inspection | 7/30/2003 | 7/31/2003 | 7/31/2003 | P | FAIL |
Troy Cobbley
|
|
|
could not perform test due to the apparent failure of the dialer module for the fire alarm pane. We did test standby battery requirements for the main facp and the power supply for the duct smoke detectors. The batteries are sized correctly 7/31/2003 12:54:04 PM
|
INSP-Conference | 7/25/2003 | 7/25/2003 | 7/25/2003 | P | DONE |
Troy Cobbley
|
|
|
spoke with the alarm technician about horn/strobe height placement, delay of pressure switch activation and inspectors test as installed by the fire sprinkler contractor 7/25/2003 3:54:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2003 | 6/27/2003 | 6/27/2003 | P | PART |
Troy Cobbley
|
|
|
russ; Phone #: ###-#### A temporary occupancy was given until the fire alarm system has been installed and approved. Temp was given with Dave Lokker's permission. All other items are OK
|