INSP-Final Inspection | 1/30/2004 | 1/30/2004 | 1/30/2004 | A | PASS |
Rick Jackson
|
|
|
|
INSP-Final Inspection | 1/23/2004 | 1/23/2004 | 1/23/2004 | A | FAIL |
Rick Jackson
|
|
|
need escutcheons on several sprinler heads; riser requires annual inspection; need sign on riser room door 1/23/2004 9:00:15 AM
|
INSP-Final Inspection | 12/5/2003 | 12/5/2003 | 12/5/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 7:28:58 AM. Contact: ###-####. second floor (north side) okay to cover 12/5/2003 10:09:49 AM
|
INSP-Sprinkler Rough-in | 11/19/2003 | 11/19/2003 | 11/19/2003 | A | PART |
Rick Jackson
|
|
|
okay to cover area by central stair and curtain around stair 11/19/2003 11:22:57 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2003 | 11/13/2003 | 11/13/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/12/2003 at 12:43:18 PM. Contact: ###-####. okay to cover wide hallway just north of the stair that leads to third floor 11/13/2003 11:17:54 AM
|
INSP-Conference | 10/31/2003 | 11/3/2003 | 11/3/2003 | A | PART |
Rick Jackson
|
|
|
Larry; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes met with Russ and Tim about combustible concealed spaces and options per NFPA 13 and for the designer to make sure it is calc'd okay 11/3/2003 9:39:21 AM
|
INSP-Final Inspection | 10/17/2003 | 10/17/2003 | 10/17/2003 | P | PART |
Rick Jackson
|
|
|
need sign on outside bell; need calc sticker and blue inspection tag; need spare heads and box hung; remove tape and add escutcheons on several heads 10/17/2003 4:03:42 PM
|
INSP-Sprinkler Rough-in | 9/24/2003 | 9/24/2003 | 9/24/2003 | P | PART |
Rick Jackson
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Darla Downs areas okay to cover as shown on approved plans 9/24/2003 5:09:07 PM
|
INSP-Conference | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | PART |
Rick Jackson
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Marc Lileks met with Russ and GC about minor changes in hallway due to ceiloing changes; dry sidewall to east canopy can be eliminated if it is noncombustible 9/4/2003 3:19:49 PM
|
INSP-Sprinkler Rough-in | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PART |
Rick Jackson
|
|
|
russ; Phone #: ###-#### Internet Inspection Request from: Marc Lileks okay to cover 2nd floor restrooms only; minor modifications made in this area due to concrete wall - okay 8/27/2003 1:24:40 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2003 | 8/20/2003 | 8/20/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/20/2003 at 9:39:21 AM. Contact: ###-####. okay to cover main hallway from main entrance to stair; still need some openings firestopped that lead to void area 8/20/2003 2:00:33 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/12/2003 | 8/13/2003 | 8/13/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/12/2003 at 1:06:28 PM. Contact: ###-####. need to verify number of heads that can be off one inch' closet by stair head is too low; duct work obstructing heads in rooms north of stairs; okaty to cover areas highlighted on approved plans 8/13/2003 5:20:44 PM
|