Permit Number | FIR03-00432 |
Status | Finaled |
Name |
TREASURE VALLEY FIRE PROTECTION
|
Site Address |
3201 W AIRPORT WAY
|
Project Name | SPR TRANSPORTATION SEC.ADMIN. |
Customer Number | |
ePlanReview | |
Description |
(TRANSPORTATION SECURITY ADMINISTRATION - NEW BOISE AIR TERMINAL - 2ND & 3RD FLOORS) To modify fire sprinklers for the remodel 3 different areas (10,390 square feet total) within the new Boise City Air Terminal for the "Transportation Security Administration". Fire sprinkler work is related to new interior nonbearing walls, two restroom/locker rooms, a folding partition, and suspended ceilings. Existing 1-hr fire-resistance rated corridors are also being modified. All work shall comply with the approved drawings and plan review report on file. This facility is fire sprinklered for fire area. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-00887.
|