Permit Information
Permit NumberFIR03-00445
StatusFinaled
Name THE SECURITY GROUP
Site Address 601 W BANNOCK ST
Project Namealm - Givens Pursley, LLP
Customer Number 
ePlanReview 
Description
To install a new manual fire alarm system in an existing building with notification appliances, sprinkler monitoring, elevator recall/shut trip and HVAC shutdown. The new system will be "phased" in by each floor. The initial phase will include the basement and first floors, providing the new FACP, sprinkler monitoring, HVAC shutdown and elevator recall/shunt trip. The second phase will be the second floor and the third phase will be the third floor. Each floor will be unoccupied during the remodel phase.

The associated building permit (BLD 02-02853) is to remodel all 3 levels of an existing 34,500 square foot 3 story office building. Work is to include 6 restrooms accessible to the disabled, interior nonbearing walls, floor infills, wall infills, and suspended ceilings all per approved drawings, engineering, and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13-1999 as regulated by the Fire Department. (GIVENS PURSLEY LLP) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing1/23/20041/26/20041/26/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 1/23/2004 at 11:51:20 AM. Contact: ###-####. resubmittals reviewed and installed per plans 1/26/2004 9:51:30 AM
INSP-Final Inspection12/18/200312/22/200312/22/2003PPART
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes tested north side of third floor - okay; will need to test the duct detectors when ready 12/22/2003 2:53:08 PM
INSP-Final Inspection11/21/200311/24/200311/24/2003PPART
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes this is for the second phase - north side of the second floor tested okay; need to clarify the pull station mentioned in the plan review notes to be located at the interior stair 11/24/2003 3:26:28 PM
INSP-Alarm Testing10/15/200310/16/200310/16/2003PPART
DetailsRick Jackson
MIke; Phone #: ###-#### Internet Inspection Request from: Annette Moore tested first floor only and sprinkler tampers and flow - okay; this project is phased and they will occupy only the north portion of the first floor; per Dave Miller the elevator is approved without alternate floor recall due to capability of the controller; will need NFPA 72 forms; maps are completed and at fire alarm panel 10/16/2003 3:45:27 PM
INSP-Conference9/24/20039/24/20039/24/2003PPART
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Darla Downs discussed occupancy requirements for phased construction of this project 9/24/2003 5:09:45 PM