INSP-Final Inspection | 3/25/2004 | 3/25/2004 | 3/25/2004 | A | PASS |
Rick Jackson
|
|
|
|
INSP-Conference | 1/15/2004 | 1/16/2004 | 1/16/2004 | P | DONE |
Troy Cobbley
|
|
|
Discussed head spacing around the file cabinets 1/16/2004 3:04:06 PM
|
INSP-Final Inspection | 10/24/2003 | 10/27/2003 | 10/27/2003 | A | FAIL |
Troy Cobbley
|
|
|
No items have been corrected from the first correction notice 10/27/2003 11:31:04 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2003 | 10/3/2003 | 10/3/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/3/2003 at 8:58:52 AM. Contact: ###-####. okay to cover; baffles and shelving not complete; need to provide spare heads that are used in this remodel - exsisting head box is full, will need new head box 10/3/2003 3:17:44 PM
|