INSP-Final Inspection | 3/9/2004 | 3/10/2004 | 3/10/2004 | A | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled 3/10/2004 8:28:15 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/4/2004 | 3/5/2004 | 3/5/2004 | A | FAIL |
Troy Cobbley
|
|
|
Consult room 100 not complete yet 3/5/2004 11:10:17 AM
|
INSP-Alarm Testing | 1/27/2004 | 1/29/2004 | 1/28/2004 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 1/27/2004 at 12:40:57 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 28 2004 11:25AM.
|
INSP-Final Inspection | 1/12/2004 | 1/12/2004 | 1/12/2004 | P | PART |
Troy Cobbley
|
|
|
Second floor sprinklers are finaled in the T.I. area 1/12/2004 3:03:20 PM
|
INSP-Final Inspection | 12/22/2003 | 12/23/2003 | 12/23/2003 | A | PART |
Troy Cobbley
|
|
|
Vault and two offices to the west are ok to cover 12/23/2003 10:40:30 AM
|
INSP-Conference | 12/5/2003 | 12/5/2003 | 12/5/2003 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 7:24:20 AM. Contact: ###-####.
|
INSP-Conference | 11/21/2003 | 11/21/2003 | 11/21/2003 | A | DONE |
Troy Cobbley
|
|
|
2nd floor conference room is ok to occupy but the 2nd floor office area will need an inspection before occupancy 11/21/2003 9:07:09 AM
|
INSP-Conference | 11/21/2003 | 11/21/2003 | 11/21/2003 | A | DONE |
Troy Cobbley
|
|
|
2nd floor conference room is ok to occupy but the 2nd floor office area will need an inspection before occupancy 11/21/2003 9:07:09 AM
|
INSP-Sprinkler Rough-in | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | PART |
Troy Cobbley
|
|
|
###-#### Rick See approved plans for locations where piping is ok to cover. In the short corridor two pendant heads have been piped from a single 1" outlet 11/5/2003 3:26:31 PM
|