INSP-Final Inspection | 4/1/2004 | 4/5/2004 | 4/5/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 4/5/2004 11:07:07 AM
|
INSP-Final Inspection | 4/1/2004 | 4/5/2004 | 4/5/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 4/5/2004 11:07:07 AM
|
INSP-Final Inspection | 4/1/2004 | 4/5/2004 | 4/5/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 4/5/2004 11:07:07 AM
|
INSP-Final Inspection | 4/1/2004 | 4/5/2004 | 4/5/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 4/5/2004 11:07:07 AM
|
INSP-Final Inspection | 4/1/2004 | 4/5/2004 | 4/5/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 4/5/2004 11:07:07 AM
|
INSP-Final Inspection | 3/22/2004 | 3/23/2004 | 3/23/2004 | A | FAIL |
Troy Cobbley
|
|
|
Hvac units did not shut down upon activation of the duct smoke detectors. Rewire and retest. Provide knox key box. Mount map. Provide singage on the storage room door showing fire alarm/fire sprinkler riser 3/23/2004 10:22:38 AM
|
INSP-Final Inspection | 12/16/2003 | 12/18/2003 | 12/18/2003 | A | FAIL |
Troy Cobbley
|
|
|
contractor apparently did not read the review comments. I went over comments with them and pointed out deficiencies. No items tested. I asked the manager of the fabric store that the panel is located in to reduce storage height and provide access to fire sprinkler riser and fire alarm panel. 12/18/2003 3:01:00 PM
|
INSP-Final Inspection | 9/30/2003 | 9/30/2003 | 9/30/2003 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with dave millers permission until the fire alarm plans have been approved and the installation has been inspected
|