INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 | A | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 11/20/2003 at 2:48:02 PM. Contact: ###-####.
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2003 | 11/21/2003 | 11/21/2003 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test is ok 11/21/2003 12:50:32 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2003 | 11/20/2003 | 11/20/2003 | P | PART |
Troy Cobbley
|
|
|
24 hour test begins with 46 lbs at 12:30 11/20/2003 12:31:35 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2003 | 11/19/2003 | 11/19/2003 | P | PASS |
Troy Cobbley
|
|
|
hydro test on the fdc is ok and hydro on the anit-freeze system at the shop is ok 11/19/2003 3:48:30 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/18/2003 | 11/18/2003 | 11/18/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/18/2003 at 9:46:00 AM. Contact: ###-####. overhead hydro okay 11/18/2003 1:07:22 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | FAIL |
Troy Cobbley
|
|
|
above ground hydro test failed 11/17/2003 3:07:41 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PART |
Troy Cobbley
|
|
|
Underground supply line hydro test is OK. Above ground hydro test failed 11/14/2003 12:51:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2003 | 11/10/2003 | 11/10/2003 | A | PASS |
Troy Cobbley
|
|
|
piping is ok to cover but one pendant head in the entry lobby is painted 11/10/2003 9:12:36 AM
|
INSP-Supply line flush | 11/7/2003 | 11/10/2003 | 11/10/2003 | A | PASS |
Troy Cobbley
|
|
|
underground flush is ok 11/10/2003 9:12:59 AM
|